At present the suite that was in Room 3 has been dismantled and this room is being remodelled as a classoom. The fible optic pipping has been placed around the school site. Ready for a whole school upgrade. The new resource room is also being built. This involves remodelling the old toilet blocks behind Room 1-5.
The new ICT suite is to be built off the library on the fence side. This will be a great resource once completed.
Tuesday, February 3, 2009
Subscribe to:
Post Comments (Atom)
It'll be exciting having a new place to work in and be able to promote information literacy with the suite and library side by side.
ReplyDelete